20/11/2020
45/88
E_MH_Installation_instructions_Skylux_Climax
Gutter combination
There are multiple gutter combination options in relation to the load and the required span for roofs with a
thermal bridge. Use the load graphs on pages 77 - 80 or calculate using the Climafast calculation application:
Gutters (with reinforcement profile)
GD1 + (V642) + G + Y16P + C11CX
GD2 + (PL165*) + (PL105*) + G + Y16P + C11CX
Shorten the gutter by 10 mm if the gutter is to be mounted between two walls. The 5 mm clearance on each side is
required for the installation of the slide ends. Gutter support GD1 or GD2 must be 10 mm shorter than the gutter
at each side. The clearance is required for thermal bridge GAP1 or GAP2.
235
102,5
67,5
72,2
G
V642
GD1
C11CX
Y16P
102,5
70
235
68,4
156,2
G
Y16P
C11CX
GD2
Y16P
Y16P
PL165
GD2C