Glazing: plastic sheets
Preparation
gutter
Glazing
GD1+G120A
GD1+G
GD2+G
GDG
Plastic sheets
10 - 45°
10 - 20°
Only the left and right sheets are cut to size.
Provide the open ends with suitable plastic tape (closed tape BT on the top side = wall side and perforated tape
BB on the bottom side = gutter side). Ensure each sheet has a end profile on the gutter side. Check whether the
end profile is perforated at the bottom. This is required for proper water drainage. Ensure that the UV-protected
side of the sheet is always upwards. See pages 17 & 18 for more information on the processing, installation and
maintenance of plastic sheets. Electrical facilities must be implemented for plastic sheets with LED lighting.
Specific installation tips are provided on page 88.
Assembly
Push support seal C5 into the hinge profile recess
between the supports. Position the glazing between the
sheet supports with the end profile against the stops on
the gutter side. Ensure that you leave 5 mm clearance at
each side.
Apply a silicone sealant that does not affect plastic
material at the top edge of the end profile. Ensure
that the multiple layer plastic sheets have a slope of
at least 10° or 18 cm per metre because, if not, the
guarantee will be void.