ASSEMBLY INSTRUCTIONS THE ZEUS CLASSIC:
fig.1
fig.2
fig.3
fig.4
fig.5
fig.6
fig.7
www.eurekatent.com
1.800.572.8822
• Grasp the apex of both poles
and raise them over the center
of the fabric. See fig.4. Attach
the middle carabiner to capture
both poles. See fig.5.
A
B
C
D
A
B
C
D
• Attach all the carabiners / clips to the poles and stake out
each corner web loop. See fig.6.
• Stake out the two vestibule webs and the side panel pull
outs. Adjust tension. See fig.7.
NOTE:
•
T
o tear down, pull out stakes and un-hook the carabiners / clips.
Collapse the poles and stow in the pole bag. Arrange the tent into a
rectangle and fold the vestibule inward. Fold the rectangle into 1/2,
lay the pole bag across the tent and roll up. Stow in carry bag.
•
T
o increase airflow into the tent body, roll down the low vent on the
door flap and secure with
V
elcro
®
fasteners.
• During high winds, tie a guy-out cord to each pole and its center
carabiner. Stake out the cords, at 3-4 feet from the tent, in line with
the direction the pole.
REV. C 4.09