background image

ASSEMBLY INSTRUCTIONS THE ZEUS CLASSIC:

fig.1

fig.2

fig.3

fig.4

fig.5

fig.6

fig.7

www.eurekatent.com

1.800.572.8822

• Grasp the apex of both poles 

and raise them over the center 
of the fabric. See fig.4. Attach 
the middle carabiner to capture 
both poles. See fig.5.

A

B

C

D

A

B

C

D

• Attach all the carabiners / clips to the poles and stake out 

each corner web loop. See fig.6.

• Stake out the two vestibule webs and the side panel pull 

outs. Adjust tension. See fig.7.

NOTE:
• 

T

o tear down, pull out stakes and un-hook the carabiners / clips. 

Collapse the poles and stow in the pole bag. Arrange the tent into a 
rectangle and fold the vestibule inward. Fold the rectangle into 1/2, 
lay the pole bag across the tent and roll up. Stow in carry bag.

• 

T

o increase airflow into the tent body, roll down the low vent on the 

door flap and secure with 

V

elcro

®

 fasteners.

• During high winds, tie a guy-out cord to each pole and its center 

carabiner. Stake out the cords, at 3-4 feet from the tent, in line with 
the direction the pole.

REV. C  4.09

Reviews: