0RQLWRULQJWLPH
)RUFHGFKHFNLQJSURFHGXUHRIWKH
EDVLFIXQFWLRQVLVUHTXLUHG
6WDUWIRUFHGFKHFNLQJSURFHGXUHRI
WKHEDVLFIXQFWLRQV
672LV
DFWLYH
$
7
Figure 6-29 Starting and monitoring the forced checking procedure (test stop)
Parameter
Description
p9659
Forced dormant error detection timer (Factory setting: 8 h)
Monitoring time for the forced dormant error detection.
r9660
Forced dormant error detection remaining time
Displays the remaining time until the forced dormant error detection and testing the
safety switch-off signal paths.
r9773.31
1 signal: Forced dormant error detection is required
Signals for the higher-level control system.
Advanced commissioning
6.15 Safe Torque Off (STO) safety function
SINAMICS G120C converter
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34263257B AF
227