![Siemens SINAMICS G120C Operating Instructions Manual Download Page 134](http://html.mh-extra.com/html/siemens/sinamics-g120c/sinamics-g120c_operating-instructions-manual_376473134.webp)
During motor data identification, "MOT-ID" flashes on the BOP‑2.
The motor data identification can take up to 2 minutes depending on the rated motor power.
Depending on the setting, after motor data identification has been completed, the inverter
switches off the motor - or it accelerates it to the setpoint.
If required, switch off the motor.
Switch the inverter control from HAND to AUTO.
You have completed the motor data identification.
027,'
Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
SINAMICS G120C converter
134
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34263257B AF