Installation
4.2 Electrical Installation
Converter with the control units CU240D-2
Operating Instructions, 04/2018, FW V4.9 SP10, A5E34262100B AF
57
Cable, connectors and tools specifications
The detailed specifications for the cables, connectors and tools required to manufacture the
necessary cables for the SINAMICS G120D are listed in the following tables. The
connections that are detailed in this section relate to the physical connections that exist on
the Inverter. Information for the preparation and construction of the individual connectors
have separate detailed instructions delivered with the ordered parts, direct from the
manufacturers. Use 75 °C copper wire only.
Note
NFPA compatibility
These devices are intended only for installation on industrial machines in accordance with
the "Electrical Standard for Industrial Machinery" (NFPA79). Due to the nature of these
devices they may not be suitable for installation accordance with the "National Electrical
Code" (NFPA70).
Table 4- 10 Tools
Article number
Crimp tool (Q8/0 and Q4/2)
3RK1902-0AH00
Removal tool (Q8/0)
3RK1902-0AJ00
Removal tool (Q4/2)
Harting part number 0999-000-0305
No special tools are required for the Control Unit connectors
Table 4- 11 Control unit connectors
Connector
Article number
Straight connector
Right-angle connector
24 V DC power supply In (7/8")
6GK1905-0FB00
3RK1902-3DA00
24 V DC power supply Out (7/8")
6GK1905-0FA00
3RK1902-3BA00
PROFIBUS In (M12)
6GK1905-0EB00
3RK1902-1DA00
PROFIBUS Out (M12)
6GK1905-0EA00
3RK1902-1BA00
PROFINET Port 1 and Port 2 (M12) 6GK1901-0DB20-6AA0
3RK1902-2DA00
Digital input and output
3RK1902-4BA00-5AA0
3RK1902-4DA00-5AA0
Encoder (M12), analog input (M12) Via KnorrTec
You find information about KnorrTec in the internet: