Advanced commissioning
6.11 Safe Torque Off (STO) safety function
Converter with the control units CU240D-2
Operating Instructions, 04/2018, FW V4.9 SP10, A5E34262100B AF
149
Procedure
1.
In the project, select "Parameter".
2.
Select "Units".
3.
Select the system of units.
4.
Select the technological unit of the technology controller.
5.
Save your settings.
6.
Go online.
The inverter signals that offline, other units and process variables are set than in the
inverter itself.
7.
Accept these settings in the inverter.
You have selected the motor standard and system of units.
❒
6.11
Safe Torque Off (STO) safety function
We recommend that you commission the safety functions using the STARTER or Startdrive
PC tool.
Commissioning tools (Page 81)
The operating instructions describe how to commission the STO safety function as basic
function for control via a fail-safe digital input.
A description of all the safety functions is provided in the "Safety Integrated" Function
Manual:
●
The basic functions and the extended functions
●
Controlling safety functions via PROFIsafe
Overview of the manuals (Page 343)