8.3
The current status...
8.3.1
Current status of your project
Completed Configuration Tasks
By this stage, you have completed almost all of the configuration steps in SIMATIC Manager
and in the CFC Editor and SFC Editor. You have compiled and downloaded this configuration,
and you have observed the project execute in the SFC and CFC Editors.
This ensures that your configuration has no errors. If you find that your project has errors when
it runs in the test mode, it is much easier to locate the error at this stage than after the entire
project is completed.
Compiling, downloading and testing the charts
8.3 The current status...
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
Getting Started, 12/2017, A5E42181435-AA
137