5.6
Current status
5.6.1
Current state of your project
Completed Configuration Tasks
So far, you have made the following settings for your project:
● You have created the "color_gs" project in SIMATIC Manager.
● You have configured the hardware components in HW Config.
● You have downloaded the hardware configuration from HW Config to the CPU.
● You have configured and loaded the PC station of the OS.
● You have entered settings in the plant hierarchy.
● You have mapped the plant structure of the "color_gs" project in the plant hierarchy.
Initial work for the project
5.6 Current status
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
Getting Started, 12/2017, A5E42181435-AA
59