5. Select your project's CPU in the tree view.
This CPU is the communication partner of the OS, which means that the OS receives the
data of this automation system.
6. In the "Connection" group, ensure that "S7 connection" type is set and the "Display
properties before inserting" check box is selected.
7. Click "OK".
The "Properties - S7 connection" dialog box opens with the "General" tab activated.
Initial work for the project
5.4 Configuring the stations
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
48
Getting Started, 12/2017, A5E42181435-AA