Adapting the OS configuration
Prerequisite
The color_gs project is open in WinCC Explorer.
Procedure
1. Open "RMT2" in the Graphics Designer.
2. Change the header text to "Plant unit RMT2".
3. Save the process picture.
4. Close the Graphics Designer.
Additional changes are not necessary because all the block icons in the process picture along
with their associated interconnections were updated by the copy operation and the subsequent
compilation operation.