13. Installation
Preparing unit for use
Once the unit is installed and before any instruments are sterilized, run two cycles. Remove the
cassette once it has cooled. Clean the top (lid) and bottom (tray) sections using a soft cloth to
wipe the inside surfaces and then rinse thoroughly with tap water. Once the cassette is clean and
dry, coat the inside surfaces with STAT-DRI. Please note that STAT-DRI drying agent is not be to
used with the U.S. models of the G4 models (G4-121101 and G4-201103).
Shipping the unit
Before you move the unit, you will need to drain the reservoir. To do so, follow these steps:
1. Place a water container below the unit.
2. Using the drain tube (see Priming the STAT
im
Pump, Figure 4) empty the contents of the
reservoir into the water container.
3. Remove any remaining water from the reservoir with a non-linting, absorbant towel.
4. Screw-in the three leveler feet found underneath the unit.
5. Repack the unit in the original packing materials and include all accessories originally included
with the unit.
6. Specify heated and insured shipping.
unit installation checklist
Listed below you will find a generic check list for use when installing a STAT
im
unit to ensure
installation is complete.
1. INVENTORY CHECK
Open box and check contents:
STAT
im
unit
Cassette tray and lid
Unwrapped instrument rack (inside cassette)
Waste bottle
Waste bottle lid and condenser fitting
Tube mounting hardware (clips and screws)
Power cord
Operators manual
Certificate of testing
Exhaust tube
STAT-DRI (not available for U.S. G4 models)
Drying plates (5000S only)
Process Challenge Device (Helix)
with test strips (S units only)
2. UNIT INSTALLATION
Set up unit as follows:
Locate unit and level
Connect Waste bottle
Fill Reservoir with steam distilled water
Prime pump
Connect mains lead and switch on machine
Install printer if appropriate
Set time and date
Check and select language as appropriate
Assign unit number if required
Assemble and insert cassette.
Run unit
STAT
IM
5000/5000S/5000 G4 Service Guide