Date Code 20011205
Distance and Overcurrent Elements
3-11
SEL-311A Instruction Manual
|IA|
50L2
(Advanced Setting)
32GF
_
+
_
+
|IG|
50GZ2
(Advanced Setting)
See Note 1 mAG < Z2MG
DWG: M311A010a
FSA
3PO
ILOP
VPOLV
Zone 2 A-Phase Mho Ground Distance Logic.
B and C Phase Are Similar.
Note 1: mAG = A-Phase to Ground Distance Calculation
Z2MG = Zone 2 Distance Setting
MAG2
MBG2
MCG2
Z2G
Relay
Word
Bits
(unless
noted)
Relay
Word
Bits
Relay
Word
Bit
2
1
3
From Figure 4.12
From Figure 4.1
From Figure 5.3
Figure 3.7: Zone 2 Mho Ground Distance Logic
Distance Element Operating Time Curves at Nominal Frequency
Figure 3.8 shows operating times for the SEL-311A Relay distance elements. The diagrams show
operating times at each test point. Operating times include output contact closure time.
For the distance element test, a fault was applied at a location representing a percentage of the
Zone 1 relay reach setting. Tests were performed for source impedance ratios (SIR) of 0.1, 1.0,
10.0, and 30.0. No pre-fault load current or fault resistance was included. Operating times are
the same for both 50 Hz and 60 Hz.
Summary of Contents for SEL-311A
Page 6: ......
Page 8: ......
Page 10: ......
Page 24: ......
Page 40: ......
Page 66: ......
Page 96: ......
Page 98: ......
Page 112: ......
Page 114: ......
Page 122: ......
Page 170: ......
Page 202: ......
Page 204: ......
Page 246: ......
Page 248: ......
Page 286: ......
Page 290: ......
Page 304: ......
Page 306: ......
Page 334: ......
Page 384: ......
Page 386: ......
Page 394: ......
Page 398: ......
Page 402: ......
Page 404: ......
Page 410: ......
Page 412: ......
Page 426: ......
Page 444: ......
Page 460: ......
Page 474: ......