Date Code 20011205
Testing and Troubleshooting
13-9
SEL-311A Instruction Manual
press the
SELECT
button to enter Access Level 2. The relay then resumes the
default display.
Press the button labeled
SET
. The display shows:
GROUP GLOBAL
PORT PASS
Press
SELECT
. Use the Down arrow button to enter the number 1, then press
SELECT
again. Use the Left arrow button to selct the menu item
SET
, then press
SELECT
again.
Note:
The SEL-311A Relays includes six setting groups. While you are testing
this relay, it is important to change settings in the group that is active. If you
change settings in an inactive setting group, the relay performance will not
change. The relay is shipped with Setting Group 1 active. You may change
the active group by executing the
GROUP
command from the relay front
panel or from a terminal connected to a relay serial port. You must enter the
Breaker Access Level or Access Level 2 to change the active group.
Press the Down arrow button repeatedly, until the upper line of the display reads:
LL = 100.00
Press
SELECT
. Use the left, right, up and down arrow keys to change the setting
to:
LL = 99.00
Press
SELECT
. Press
EXIT
. Press
SELECT
(YES) to save the new settings.
Step 10.
Purpose: Test the fault locator.
Method: Test the fault locator using the voltages and currents in Table 13.1. These
voltages and currents were obtained for various locations and fault types assuming a
radial line with a source impedance of 0.2 times the total 100 mile line impedance.
Note:
To simplify this step, apply dc voltage to the IN1 input. The relay
recognizes the asserted input when applied dc voltage is approximately equal
to the Logic Input voltage rating shown on the relay identification sticker.
Input IN1 is programmed to monitor the breaker auxiliary contact, 52A.
Energize the IN1 input for the duration of this step to block the Switch-Onto-
Fault logic from operating. If dc voltage source is not available, set ESOTF
= N in the relay settings.
Run ground fault tests using the test source connections shown in Figure 13.2,
Figure 13.3, or Figure 13.5. Run phase-to-phase fault tests using the test source
connections shown in Figure 13.1, Figure 13.3, or Figure 13.6.
Summary of Contents for SEL-311A
Page 6: ......
Page 8: ......
Page 10: ......
Page 24: ......
Page 40: ......
Page 66: ......
Page 96: ......
Page 98: ......
Page 112: ......
Page 114: ......
Page 122: ......
Page 170: ......
Page 202: ......
Page 204: ......
Page 246: ......
Page 248: ......
Page 286: ......
Page 290: ......
Page 304: ......
Page 306: ......
Page 334: ......
Page 384: ......
Page 386: ......
Page 394: ......
Page 398: ......
Page 402: ......
Page 404: ......
Page 410: ......
Page 412: ......
Page 426: ......
Page 444: ......
Page 460: ......
Page 474: ......