1
3 4
2
29
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Square Clock - Locally Powered
1) If you are installing a new gang box in the wall,
leave at least 4 inches between the top of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
If you are using an existing gang box, the top of the
gang box must be a minimum of four inches away
from the ceiling.
Ceiling
Minimum
3) Detach the housing from the back of the clock.
Do this by inserting a flat-blade screwdriver about
1/8 inch into each of the slot holes until the housing
detaches. You may hear a snapping noise as the
latches disengage.
4) Release the mounting piece from the back of
the housing by sliding it towards the center of the
housing, then pulling it back and away from
the housing.
Mounting
piece
Housing
1
2
2) Run power wiring to the gang box.
Pull the YELLOW and ORANGE wires out of
the connector.
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC/DC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.