13
14
12
44
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
13)
First remove the gearbox pin
, then attach a
power connector to the port on the side of
the movement.
14) Lay any excess wiring across the strain relief base, then attach the strain relief to the clock with the two
#6-19x7/16 screws. The strain relief should be tight enough to prevent the wire from sliding.
Black
White
Black
White
Power
Common
CLOCK 1
Gang
Box
Green
Gr
een
Ground
12) Attach the power wires from your kit to the
wires you threaded through the pole.
• Attach the Hot wire to the connector’s black wire.
• Attach the Common wire to the connector’s
white wire.
• Attach the Ground wire to the connector’s
green wire.
Consult the diagram below for additional help.
1
2