Owner’s Manual
400-051-202-01 Rev. B
Page A-7
Figure A-1, Single Operator LOTO Figure A-2, Multiple Operator LOTO
4.
If more than one operator will be working on the machine(s), each operator must
place a padlock and lock tag on the plug lockout. Additional padlocks can be locked
directly through the plug lockout (if the lockout has multiple lock holes) or can be
used in combination with a multi-hole lockout hasp. See Figure A-2.
5.
TEST.
Verify that the machine pair is de-energized by switching the system
controller main power switch to ON. Wait 10 seconds. If the system controller
display remains off (blank) and there are no signs of machine activation (e.g. beeping,
clicking, LEDs on, etc.), the machine pair is de-energized. Otherwise, LOTO has not
been implemented correctly. Repeat Steps 1-4 to ensure LOTO is implemented
correctly. After a successful test, switch the system controller main power switch
back to OFF.
6.
Perform all required maintenance, troubleshooting, cleaning tasks.
7.
Once all work is complete, ensure that all personnel and tools are out of the machine
boundary.
8.
Remove all LOTO devices and re-insert the main power plug into the system
controller.
9.
Switch system controller main power switch to ON.
10.
Press
RESET E-STOP
button on system controller.
11.
Wait for system controller to finish booting up.
12.
Set Odd and Even lane
Chassis Mode
to BOWL.
13.
Press
FULL SET
, then
PLAY
for each lane to reconnect both lanes with facility
scoring system (if installed).
Summary of Contents for Edge String
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...Owner s Manual 400 051 202 01 Rev B Page i Table of Contents...
Page 8: ......
Page 13: ...Owner s Manual 400 051 202 01 Rev B Page 1 1 Section 1 Safety...
Page 14: ......
Page 32: ......
Page 33: ...Owner s Manual 400 051 202 01 Rev B Page 2 1 Section 2 Operation...
Page 34: ......
Page 61: ...Owner s Manual 400 051 202 01 Rev B Page 3 1 Section 3 Maintenance...
Page 62: ......
Page 73: ...Owner s Manual 400 051 202 01 Rev B Page 3 13 Figure 3 7 Pin Rotation Sequence...
Page 75: ...Owner s Manual 400 051 202 01 Rev B Page 4 1 Section 4 Troubleshooting...
Page 76: ......
Page 92: ......
Page 99: ...Owner s Manual 400 051 202 01 Rev B Page 5 9...
Page 100: ...Owner s Manual 400 051 202 01 Rev B Page 5 10 Gearmotor Control Box...
Page 110: ...Owner s Manual 400 051 202 01 Rev B Page 5 20 Tables Assembly...
Page 113: ...Owner s Manual 400 051 202 01 Rev B Page 5 23...
Page 114: ...Owner s Manual 400 051 202 01 Rev B Page 5 24 Shield Pitlight Assembly...
Page 117: ...Owner s Manual 400 051 202 01 Rev B Page 5 27...
Page 118: ...Owner s Manual 400 051 202 01 Rev B Page 5 28 Odd Machine Back End Assembly...
Page 122: ...Owner s Manual 400 051 202 01 Rev B Page 5 32 Even Machine Back End Assembly...
Page 129: ...Owner s Manual 400 051 202 01 Rev B Page 5 39 Chain Lift Assembly...
Page 130: ...Owner s Manual 400 051 202 01 Rev B Page 5 40 Chain Lift Upper Assembly Detail...
Page 140: ...Owner s Manual 400 051 202 01 Rev B Page 5 50 Double Division Pit Rear Guard Single...
Page 145: ...Owner s Manual 400 051 202 01 Rev B Page 5 55...
Page 146: ...Owner s Manual 400 051 202 01 Rev B Page 5 56 Machine Rear Cover...
Page 151: ...Owner s Manual 400 051 202 01 Rev B Page 5 61...
Page 152: ...Owner s Manual 400 051 202 01 Rev B Page 5 62 EDGE String Tool Kit...
Page 154: ...Owner s Manual 400 051 202 01 Rev B Page 5 64...
Page 155: ...Owner s Manual 400 051 202 01 Rev B Page 5 65 Cables...
Page 156: ......
Page 158: ......
Page 168: ......
Page 170: ......
Page 174: ......
Page 175: ...Owner s Manual 400 051 202 01 Rev B Page D 1 Appendix D Preventive Maintenance PM...
Page 176: ......
Page 180: ......
Page 181: ...Owner s Manual 400 051 202 01 Rev B Page E 1 Appendix E Non Routine Maintenance Procedures...
Page 182: ......
Page 207: ...Owner s Manual 400 051 202 01 Rev B Page F 1 Appendix F EDGE String Product Matrix...
Page 208: ......
Page 210: ......