Maintenance Processes
10.4
Maintenance process details
The maintenance processes listed below are only to be completed on request at the direction
of an authorized Neopost Service Technician.
Check that your Mailing System is connected to the LAN before starting.
As supervisor (see
on page 154):
Press
and select the path:
Maintenance
Processes
1.
Installation Process
- First time installation of your system.
2.
Disconnect Base
- Remove the base from service.
- Prepares the base for removal by saving data on USB key.
3.
Withdraw a Meter
- Remove Postage Meter from service.
4.
Update Registration
- This procedure is used if you have changed your postal code.
- Contact your Customer Service to change your information then you will be
instructed to perform the update registration procedure.
Running the Installation Wizard
This type of call should only be completed upon request from the Neopost Customer Service
Centre or by an authorized Neopost Service Technician. Check that your Mailing System
is connected to the LAN before starting.
217
| Page 217 | | Jan-13-2017 10:45 |
10
Maintaining y
our Mailing System
Summary of Contents for IN-600
Page 1: ...User Guide IN 600 Mailing Systems ...
Page 5: ... Page 4 TOC Jan 13 2017 10 45 ...
Page 7: ......
Page 15: ......
Page 27: ......
Page 89: ...The Label Dispenser can hold up to 40 labels 84 Page 84 Jan 13 2017 10 45 3 Processing Mail ...
Page 91: ......
Page 99: ......
Page 125: ......
Page 147: ......
Page 155: ......
Page 177: ...Geodesic 172 Page 172 Jan 13 2017 10 45 8 Configuring your Mailing System ...
Page 178: ...Geodesic codes 8 Configuring your Mailing System 173 Page 173 Jan 13 2017 10 45 ...
Page 189: ......
Page 191: ......
Page 205: ......
Page 225: ......
Page 227: ......
Page 239: ......
Page 241: ......
Page 253: ... Index Page 248 Jan 13 2017 10 45 A0079314 C 13 01 2020 ...
Page 254: ...A0079314 C 13 01 2020 ...