7 Testing and Maintenance
88
Carrying Out and Reporting Tests
Test Report
Test and Inspection Matrix
Testing Organization:
Name of testing person:
(Check one of the following three options)
Test before putting into service (reference
value)
Recurrent Test
Test after Repair
Responsible Organization:
Device Under Test:
ID-Number
Product Number:
Serial No.:
Accessories:
Measurement Equipment (Manufacturer, Type,
Serial No.):
Functional Test (parameters tested):
Test Block
Test or Inspection
to be Performed
Expected Test Results
Record the Results (mandatory for
Philips Personnel only)
What to Record
Actual Results
Visual
Inspection
Perform Visual
Inspection -- see
“When to Perform
Tests” on page 56.
Pass or Fail
V:P or V:F
Power On
Power on the unit.
Does the self-test
complete
successfully?
If Yes, Power On test is passed.
PO:P or PO:F
Summary of Contents for Avalon FM20
Page 2: ......
Page 6: ...6 ...
Page 38: ...3 Installation Instructions 38 ...
Page 46: ...4 Theory of Operation 46 ...
Page 155: ...10 Repair and Disassembly 155 11 Put the two halves of the display assembly together as shown ...
Page 167: ...10 Repair and Disassembly 167 10 Remove the four screws holding the recorder chassis ...
Page 169: ...10 Repair and Disassembly 169 12 Remove the RFI bracket 13 Lift out the recorder chassis ...
Page 254: ...12 Specifications 254 ...
Page 259: ......
Page 260: ...Part Number 453564541271 Published in Germany 11 14 453564541271 ...