7 Testing and Maintenance
58
NOTE
It is the responsibility of the facility operator, or their designee, to obtain reference values for recurring
safety and system tests. These reference values are the results of the first test cycles after an installation.
You may also purchase this service from Philips.
Testing Sequence
Here is a summary of the recommended sequence of testing:
NOTE
If any single test fails, testing must be discontinued immediately and the device under test must be
repaired or labeled as defective.
Combining or exchanging system components
Perform the system test
Service Event
Test Block(s) Required - Complete these tests
Summary of Contents for Avalon FM20
Page 2: ......
Page 6: ...6 ...
Page 38: ...3 Installation Instructions 38 ...
Page 46: ...4 Theory of Operation 46 ...
Page 155: ...10 Repair and Disassembly 155 11 Put the two halves of the display assembly together as shown ...
Page 167: ...10 Repair and Disassembly 167 10 Remove the four screws holding the recorder chassis ...
Page 169: ...10 Repair and Disassembly 169 12 Remove the RFI bracket 13 Lift out the recorder chassis ...
Page 254: ...12 Specifications 254 ...
Page 259: ......
Page 260: ...Part Number 453564541271 Published in Germany 11 14 453564541271 ...