Page 3-16
3-7
Board Transfer Test
After adjusting the board rail width and support pins, the board transfer test is carried out on the
board transfer screen. The board transfer end position blinks as Carry in
→
Load
→
Unload
→
Carry out and on the screen during board transferring.
NOTICE
Actually, the transfer test for whole line is carried out. This section describes the
board on the rear conveyor in the pre-station after the transfer test before the pre-
station.
1.
Turn ON the servo switch.
2.
Press
Product
config
.
• The production setting screen appears.
3.
Press PCB transfer .
• The board transfer screen appears.
193C-E-EMA03-A02-00
To the next page
OFF ( ) ON ( )
SERVO
193C-EOp-Pc-001
Summary of Contents for KXF-193C
Page 2: ......
Page 10: ...Page 10 193C E EMA00 A02 01 INDEX AppendixA RECOGNITION DEVICE ...
Page 32: ...Page 32 193C E EMA00 A04 01 MEMO ...
Page 46: ...Page 1 14 193C E EMA01 A01 01 MEMO ...
Page 80: ...Page 3 26 193C E EMA03 A02 01 MEMO ...
Page 128: ...Page 4 48 193C E EMA04 A03 01 MEMO ...
Page 158: ...Page 5 30 193C E EMA05 A01 01 MEMO ...
Page 176: ...Page 6 18 193C E EMA06 A01 01 MEMO ...
Page 192: ...Page 7 16 193C E EMA07 A01 01 MEMO ...
Page 202: ...Page 8 10 193C E EMA08 A01 01 MEMO ...
Page 206: ...Page 4 193C E EMA0Z A01 01 MEMO ...