Page 3-9
CHANGING THE
PRODUCTION BOARDS
3
193C-E-EMA03-A01-01
Positioning and Lift Transfer Rail Width Adjustment
3-2-3
Setting the Board Under Holder Plate on the Movable Side
Set the board under holder plate on the movable side which is removed at the procedure 3-2-1.
1.
Turn off the servo switch.
2.
Set the board under holder plate on
the movable side to the conveyor on
that side.
• Fix the lower part of plate with two of M3 bolts.
• Set the under holder plate so that the gap
between it and the clamp plate on the movable
side gets 1 mm to 2 mm.
• Set it not to shield the under holder interlock
sensor attached to the conveyor on the mov-
able side.
OFF ( ) ON ( )
SERVO
Board under holder
plate on movable side
M3 bolts
Summary of Contents for KXF-193C
Page 2: ......
Page 10: ...Page 10 193C E EMA00 A02 01 INDEX AppendixA RECOGNITION DEVICE ...
Page 32: ...Page 32 193C E EMA00 A04 01 MEMO ...
Page 46: ...Page 1 14 193C E EMA01 A01 01 MEMO ...
Page 80: ...Page 3 26 193C E EMA03 A02 01 MEMO ...
Page 128: ...Page 4 48 193C E EMA04 A03 01 MEMO ...
Page 158: ...Page 5 30 193C E EMA05 A01 01 MEMO ...
Page 176: ...Page 6 18 193C E EMA06 A01 01 MEMO ...
Page 192: ...Page 7 16 193C E EMA07 A01 01 MEMO ...
Page 202: ...Page 8 10 193C E EMA08 A01 01 MEMO ...
Page 206: ...Page 4 193C E EMA0Z A01 01 MEMO ...