OPTIMUM
M A S C H I N E N - G E R M A N Y
Version 1.1.6 dated 2014-10-16
Page 3
Original operating instructions
F150
GB
Transportation to the installation site...................................................................................................... 31
3.7.1 Forklift truck................................................................................................................................. 31
3.7.2 Crane .......................................................................................................................................... 32
Installation and assembly ....................................................................................................................... 33
3.8.1 Aligning the machine................................................................................................................... 33
3.8.2 Assembly of the coolant / lubricant tank and of the chip conveyor ............................................. 34
3.8.3 Assembly of the coolant / lubricant pumps.................................................................................. 35
3.8.4 Mounting the optional coolant through spindle............................................................................ 39
3.8.5 Mounting the heat exchanger on the switch cabinet ................................................................... 40
3.8.6 Mounting the electronic handwheel............................................................................................. 40
Transport locking devices....................................................................................................................... 41
3.9.1 Transport locking device, 16-type tool changer .......................................................................... 41
3.9.2 Transport locking device, doors .................................................................................................. 41
3.9.3 Transport locking device, axes.................................................................................................... 42
3.9.4 Mounting the telescopic covers................................................................................................... 43
3.9.5 Corrosion protection.................................................................................................................... 43
3.9.6 Electrical connection ................................................................................................................... 43
3.9.7 Connection compressed air supply ............................................................................................. 45
Refill central lubrication system.............................................................................................................. 47
3.11.1 Functional test and controls ........................................................................................................ 47
3.11.2 Warming up the machine ............................................................................................................ 48
3.11.3 Passwords................................................................................................................................... 48
3.11.4 Data backup on the control ......................................................................................................... 49
Coordinate systems on CNC machine tools........................................................................................... 50
4.2.1 Cartesian coordinate system....................................................................................................... 50
4.2.2 Polar coordinate system.............................................................................................................. 51
4.2.3 Machine coordinate system ........................................................................................................ 51
4.2.4 Workpiece coordinate system ..................................................................................................... 51
4.2.5 Rotary axes and secondary axes................................................................................................ 52
User interface, machine control panel
Controls on the machine control panel................................................................................................... 64
5.3.1 Key switch.................................................................................................................................. 69