OPTIMUM
M A S C H I N E N - G E R M A N Y
Assembly and commissioning
Version 1.1.6 dated 2014-10-16
Page 31
Original operating instructions
F150
GB
3.7
Transportation to the installation site
ATTENTION!
The CNC machine is lifted and transported at the machine substructure or at the load
suspension points using an appropriate conveyor system.
Check the substructure. The substructure has to bear the load.
substructure [kN/m2]“ on page 21
ATTENTION!
Make sure that the load attachment point is balanced (Centre of gravity).
Disassemble the clamping bolts which are used to fix the machine on the pallet.
Lift the CNC machine carefully from the pallet of the transportation box by means of a crane
or a fork-lift truck.
WARNING!
The use of unstable lifting and load suspension equipment that might break under load
can cause severe injuries or even death.
3.7.1 Forklift truck
Img.3-2:
Transporting by fork-lift truck