![background image](http://html.mh-extra.com/html/omron/sysmac-3g8f7-clk12-ev1/sysmac-3g8f7-clk12-ev1_operation-manual_1633421174.webp)
154
Cleaning and Inspection
Section 9-4
Controller Link Support Software
Read or clear the error log using the following procedure.
1,2,3...
1. Display the Main Menu.
2. Select “E: Error log.”
3. Select “R: Read.”
4. Designated the node. The error log for the designated node will be dis-
played.
5. Press the F7 (Clear) Key. The designated node error log will be cleared.
Message Service
Reading an Error Log
Send the ERROR LOG READ FINS command (command code 2102) to the
appropriate node. Refer to
Clearing an Error Log
Send the ERROR LOG CLEAR FINS command (command code 2103) to the
appropriate node. Refer to
.
9-4
Cleaning and Inspection
9-4-1
Cleaning
Conduct the following periodic cleaning to keep the Controller Link Support
Board in optimum condition.
• Wipe the Unit with a dry, soft cloth daily.
• If glue, vinyl, or tape is left on the Board for long periods of time, it will
stain. Remove these items during cleaning.
!Caution
Do not use volatile solvents such as benzine or paint thinner, or chemical
cloths for cleaning. They will damage the quality of the coating on the Board.
9-4-2
Inspection
Controller Link Support Boards must be inspected on a regular basis to
ensure correct operation. Inspections should be conducted once every 6 to 12
months. If the Board is subject to extremes in temperature or humidity,
inspections should be conducted on a more regular basis.
Tools and Equipment Need for Inspection
The following tools and equipment will be needed to perform inspection and
adjustments.
• Assorted flat-blade and Phillips screwdrivers
• Circuit tester or digital voltmeter
• Industrial-grade alcohol and clean cotton cloth
• Synchroscope
• Pen-chart recording oscilloscope
• Thermometer, hygrometer
• Optical tester
Summary of Contents for SYSMAC 3G8F7-CLK12-EV1
Page 2: ......
Page 4: ...iv ...
Page 20: ...xx Conformance to EC Directives 6 ...
Page 48: ...28 Applications Precautions Section 1 4 Example CX Programmer Response Timeout Setting ...
Page 68: ...48 Backup Power Supply Wiring Optical Ring Systems Only Section 2 4 ...
Page 74: ...54 Using the C Library Section 3 2 ...
Page 110: ...90 Changing the Data Link Tables with Active Data Links Section 5 5 ...
Page 187: ......