![Omron fz5 series Hardware Setup Manual Download Page 73](http://html1.mh-extra.com/html/omron/fz5-series/fz5-series_hardware-setup-manual_742694073.webp)
3 - 11
3 Configuration
Vision System FZ5 series Hardware Setup Manual (Z423)
3-1 Sen
sor Co
nt
ro
ller
3
3-
1-1 F
H-1
000/2000/300
0/5000 Ser
ies
Detailed LED specifications are given below.
Additional Information
The timing of the flashing of the EtherCAT operation indicators is as follows:
EtherCAT status indicator LED
LED name
Color
Status
Contents
ECAT RUN
Green
OFF
Initialization status
Blinking
Pre-Operational status
Single flash
Safe-Operational status
ON
Operational status
ECAT ERROR
Red
OFF
No error
Blinking
Communication setting error or PDO mapping
error
Single flash
Synchronization error or communications data
error
Double flash
Application WDT timeout
ON
PDI WDT timeout
L/A IN
Green
OFF
Link not established in physical layer
Flickering
In operation after establishing link
ON
Link established in physical layer
L/A OUT
Green
OFF
Link not established in physical layer
Flickering
In operation after establishing link
ON
Link established in physical layer
ON
OFF
ON
OFF
ON
OFF
ON
OFF
Flickering
Blinking
Single flash
Double flash
50 ms
200 ms 200 ms
200 ms
200 ms
1000 ms
200 ms 200 ms 200 ms
1000 ms