![Omron fz5 series Hardware Setup Manual Download Page 215](http://html1.mh-extra.com/html/omron/fz5-series/fz5-series_hardware-setup-manual_742694215.webp)
5 - 45
5 Setup and Wiring
Vision System FZ5 series Hardware Setup Manual (Z423)
5
-8 In
stallation
in a C
ontrol Pan
el
5
5-
8-4 F
H-L
S
e
rie
s
Mounting of the Back Side
• Recommended tightening torque: 0.54 N
•
m to 0.6 N
•
m
• The tolerance:
±
0.2 mm
Clearance: 50 mm
Clearance: 50 mm
Clearance: 50 mm
Clearance: 30 mm
Clearance: 30 mm
Clearance: 30 mm
Clearance: 30 mm
100
55
Four, M4 depth 6.5
59
10.5