2-2. Wiring the Communication Cable and Connecting to the Unit
2-2-1. Wiring Communication Cable
• Connect SD signal of attachment adapter and SD signal of PLC side.
• Cable length must be 15 m or less.
2-2-2. Connect the attachment adapter to the built-in 232C port of the CPU unit.
L
H
64IN
To attachment
adapter
To
PLC
Signal Pin
No.
Pin
No. Signal
RD 2
2 SD
SD 3
3 RD
ER 4
4 RS
SG 5
5 CS
DR 6
7 DR
RS 7
8 ER
CS 8
9 SG
FG -
- FG
2-12 Temperature Controller
E5ZN-2
Summary of Contents for FB LIBRARY -
Page 1: ......
Page 14: ...2 1 Controller Link Unit CJ1W CLK21 V1...
Page 23: ...2 2 DeviceNet Slave DRT2 Series DRT2...
Page 31: ...2 3 Position Control Unit CJ1W NCF71...
Page 42: ...2 4 Position Control Unit CJ1W NC113 133 213 233 413 433...
Page 49: ...2 5 Position Control Unit CS1W NC113 133 213 233 413 433...
Page 57: ...2 6 Inverter 3G3MV A2 AB A4 3G3RV A2 A4...
Page 71: ...2 7 Servo Driver R88D WT WT H WT HL R7D AP H AP L...
Page 84: ...2 8 RFID ID Sensor V600 H...
Page 95: ...2 9 Vision Sensor F160 C10...
Page 105: ...2 10 2D Code Reader V530 R2000 R160 R150V3...
Page 118: ...2 11 Smart Sensor ZX SF11 ZX LD40 ZX LDA11 N...
Page 129: ...2 12 Temperature Controller E5ZN 2...
Page 139: ...2 13 Temperature Control Unit CJ1W TC001 101 003 103 002 102 004 104...