Getting Started with Radar
Radar/Chart Radar User Guide
65900010
2-5
System Start-Up
Switching on the System
The VisionMaster workstation is designed such that one switch at the
workstation typically applies power to that workstation’s computer and
monitor.
In a multi-node system, as the system is started, the software automatically
establishes communication with other workstations that may already be
running.
To start up the system press the On/Off rocker switch, located on the
underside of the control panel. When this switch is turned On the system
powers up.
The On/Off switch is the only system control accessible to the
operator. Do NOT remove the front panel.
CAUTION:
When starting up the system always leave at least one minute
after the system has powered down before switching the On/Off
switch to On.
Summary of Contents for VisionMaster FT
Page 1: ...Radar Chart Radar User Guide Northrop Grumman Sperry Marine B V Part Number 65900010 ...
Page 2: ......
Page 4: ...Radar Chart Radar User Guide 65900010 ii Intentionally Blank ...
Page 24: ...Overview Radar Chart Radar User Guide 1 2 65900010 Single System ...
Page 42: ......
Page 114: ......
Page 212: ......
Page 304: ......
Page 370: ......
Page 450: ......
Page 462: ......
Page 502: ......
Page 516: ......
Page 532: ......
Page 533: ......