
- 107 -
NEW LEADER • NL5000G5 AGCO
www.New-Leader.com
(800) 363-1771
314520-AA-A
Page Rev. A
Header
Controller Operations
9.
Measure the height of the actual feedgate opening
from the conveyor as shown by measurement C.
C
10.
Enter the measured height of the feedgate opening into
the display. Press
to continue.
11.
Repeat steps 2 - 10 for all installed feedgates.