- 55 -
NEW LEADER • NL5000G5 AGCO
www.New-Leader.com
(800) 363-1771
314520-AA-A
Page Rev. A
Header
General Operating Procedures
Visit
http://newleader.highwayequipment.com/calculators/yield-output
for interactive tools to
calculate yield, proper feedgate opening, conveyor revolutions per minute, and mph to maximize
the performance of your spreader.
NOTE:
It is recommended that spread pattern tests be conducted prior to each spreading season, after
any spreader maintenance, before applying a new product, and periodically during the spreading
season. Spread pattern tests must be performed for each product, blend and application rate. See
“Spread Pattern” section of this manual for details.
1.
Make sure unit has been properly serviced and is in good operating condition. It is recommended to run the
spreader prior to loading material to ensure acceptable operation.
2.
Set machine settings in controller per Controller Operations section in this manual.
3.
Select or create material profile for material and application.
4.
Adjust feedgate to appropriate setting.
5.
Spread pattern test for any new material.
6.
Fill unit with material to be spread.
7.
Engage hydraulics.
8.
Begin spreading.
CAUTION
Drive only at speeds which permit secure control of vehicle!
NOTICE!
CHANGE HYDRAULIC OIL FILTER AFTER FIRST WEEK (OR NOT MORE THAN 50 HOURS) OF OPERATION
ON A UNIT.