140
BioFlo/CelliGen 115
y
M1369-0050
User’s Guide
Level Probes
Application of, 89
Liquid Addition Systems, 78
Loading Pump Tubing, 77
Location
Environment, 9
Physical, 9
Loop Setpoints
Entering the, 56
Modifying the, 57
M
Maintenance, 111
Maintenance Inspections, 112
Manual Conventions, v
Mass Flow Controller, 6
Media Formulation, 125
Microaerophilic Culture, 105
Modbus Com Port Pin Designation, 46
Motor Assembly
Installation of, 43
Motor Replacement, 112
N
N2(3), 95, 96
NOTE
Symbol for, v
O
O2(2), 95, 96
Operating Control Mode
Changing the, 93
Operating Controls, 50
Operating Tips, 108
OTR
Calculating an, 122
Determining an, 122
Factors that Affect, 123
Out Mult, 86
Output Multiplier, 86
P
P&I Gains, 66
Parts Lists, 113
pH
Control of, 6
pH Probe, 6
Calibration of, 62
Inspection of, 62
Installation of, 34, 64
Maintenance of, 65
Storage of, 65
PID
Explanation of Constants, 119
Explanation of Tuning, 120
Preparing for a Fermentation Run, 101
Preparing Vessel for Autoclaving, 128
Probe Calibration
Definition of, 119
Probe Cleaning, 133
Probe Removal, 133
Probe Storage, 111, 133
Process Control Settings
Recommendations for, 128
Pump Array
Standard, 84
Pump Assignment, 84
Pump Assignment Screen, 89
Pump Calibration, 87, 90
Pump Control Modes, 87
Pump Flow Rate, 87
Pump Period (sec), 88
Pump Screen, 59
Pump Setpoints, 85
R
Regulatory Compliance, 48
Removing a Utility Station, 100
Renaming Control Loops, 55
Replacement Parts, 113
Rotameter, 6
RTD, 32
RTD Probe
Installation of, 80
S
Sampler
Installation of, 38
Sampler Tube
Installation of, 32
Sampling, 103