3-20 Setting Up Your Server
The Power On Self-Test (POST) runs while "NEC" logo is displayed to diagnose the system
hardware. See "POST" described later for details.
Upon completion of POST, the OS starts.
NOTE:
When the POST detects any error, it displays an error message
and its measure on the display unit. See Chapter 10 for details of POST
error message.
Summary of Contents for N8100-1575F
Page 16: ...x This page is intentionally left blank...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank...
Page 158: ...5 30 Installing Windows Server 2008 4 Activate Windows The Windows activation is complete...
Page 256: ...8 12 Installing and Using Utilities This page is intentionally left blank...
Page 268: ...9 12 Maintenance This page is intentionally left blank...
Page 372: ...C 2 IRQ This page is intentionally left blank...
Page 374: ...D 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Page 378: ...E 4 Product Configuration Record Table This page is intentionally left blank...