A-2 Specifications
2.5-inch Hard Disk Drive Model
NEC Express5800/iR120a-1E
Item
N8100-1575F
N8100-1576F
N8100-1577F
Type
Quad-core Intel
Xeon
processor
Clock
2GHz
2.26GHz
2.13GHz
Standard
1
CPU
Maximum
2
Chipset
Intel 5500 (800/1066 MHz)
Memory module
DDR3-1333
Minimum
1GB
Maximum
32GB (4GB x 8)
Memory
Error check
ECC
Graphics accelerator
ServerEngines
2nd Gen Server Management Controller embedded
Video RAM
8MB
Display
Graphic display
640x480, 800x600, 1,024x768, 1,280x1,024:
16,770,000 colors max.
Floppy disk drive (standard) None
Hard disk drive (standard)
None
Hard disk drive (maximum)
SATA2 (500GB x 8), SAS (300G x 8), SSD (50G x 8)
Hot-plug hard disk drive
SAS/SATASSD HDD x 8
Auxiliary
storage
device
Optical disk drive (standard) None
Additional
slot
PCI
PCI EXPRESS (x8) x 1, PCI EXPRESS (x8) x 1 (x16 socket)
Standard
Onboard SATA SW RAID (0, 1, 10)
Disk array
Option
RAID Controller
Internal interface
SAS: None (option)
SATA: 6 ports
Keyboard
None
Mouse
None
Serial
Rear: D-sub 9-pin (RS-232C compliant) x 1
Internal: D-sub 9-pin (RS-232C compliant) x 1 (Option)
Network
1000Base-T/100Base-TX/10Base-T (RJ-45, 2 ports)
100Base-TX/10Base-T (1 port for management port)
Display
D-sub 15-pin x 2 (1 each on front and rear panel)
Interface
USB2.0
4-pin connector x 4 (2 for front panel, 2 for rear panel)
Chassis design
Rack-mount (1U height)
External dimensions (mm)
444 (width)
×
44.3 (height)
×
617 (depth)
Weight (Max.)
10.5 kg (16 kg)
Power supply
100 to 120 VAC
±
10%, 200 to 240 VAC
±
10%, 50/60 Hz
±
1 Hz
Operating
366 VA, 363 W
353 VA, 350 W
335 VA, 332 W
Power consumption
Standby
212 VA, 210 W
194 VA, 192 W
192 VA, 190 W
Temperature
10 to 35°C (operating), -10 to 55°C (non-operating, storage)
Environmental
requirements
Humidity
20 to 80% RH (no condensation)
Summary of Contents for N8100-1575F
Page 16: ...x This page is intentionally left blank...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank...
Page 158: ...5 30 Installing Windows Server 2008 4 Activate Windows The Windows activation is complete...
Page 256: ...8 12 Installing and Using Utilities This page is intentionally left blank...
Page 268: ...9 12 Maintenance This page is intentionally left blank...
Page 372: ...C 2 IRQ This page is intentionally left blank...
Page 374: ...D 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Page 378: ...E 4 Product Configuration Record Table This page is intentionally left blank...