4-4
Disassembly and Reassembly
Tools Recommended for Upgrading Your
System
Depending on the upgrade, you will need one or more of the following tools:
!
Phillips screwdriver (#1 bit and #2 bit)
!
Flat-head screwdriver
!
Small needle nose pliers
!
Pen or pencil
!
ESD workstation or antistatic wrist strap (recommended)
Preparing Your System for Disassembly and
Reassembly
To prepare your system for installation or removal of system components
perform the following procedure:
1.
Observe the safety and ESD precautions listed under
General Information
and
Static Precautions
at the beginning of this chapter.
2.
Open the front bezel of your system's cabinet. For rack-mount systems you
must remove the front panels of the system chassis.
3.
Shutdown the operating system (OS).
4.
Press the power on/off switch on the front panel of the server (see
Front View
in Chapter 2). The power-on LED goes out.
5.
Power off the peripheral devices.
6.
Unplug the system power cord(s) from the AC wall outlet(s).
Note:
If the system power cord is connected to a power
control unit such as an UPS (Uninterruptible Power Supply),
refer to the UPS user's guide for proper power-off
procedures.
7.
Unplug all the I/O cables connected to the rear panel of your system.
Summary of Contents for Express 5800/120Lg
Page 1: ... S e r v i c e G u i d e EXPRESS5800 120Lg ...
Page 2: ......
Page 4: ......
Page 10: ......
Page 73: ...Disassembly and Reassembly 4 7 Figure 4 2 Installing the Left Hand Side Access Panel ...
Page 132: ......
Page 161: ...6 Illustrated Parts Breakdown Exploded View Field Replaceable Units ...
Page 168: ......
Page 169: ...A Specifications System Specifications ...
Page 179: ...C IRQ and I O Port Addresses Interrupt Requests PIRQ and PCI Device ...
Page 188: ......
Page 198: ......
Page 203: ...xx ...
Page 204: ... 456 01673 000 ...