Problem Solving
Forced Shutdown
Use this function when an OS command does not shut down the server, the POWER
switch does not turn off the server, or resetting does not work.
Press and hold the POWER switch on the server for at least four seconds. The power is
forcibly turned off. To turn on the power back again, wait approximately 10 seconds
after turning off the power (forced shutdown).
Figure 5-2. Pressing the Power Button
IMPORTANT
:
If the remote power-on function is used, cycle the power once to
load the OS, and turn off the power again in the normal way.
Press here for at
least 4 seconds.
Summary of Contents for Express 5800/120Lg
Page 1: ... S e r v i c e G u i d e EXPRESS5800 120Lg ...
Page 2: ......
Page 4: ......
Page 10: ......
Page 73: ...Disassembly and Reassembly 4 7 Figure 4 2 Installing the Left Hand Side Access Panel ...
Page 132: ......
Page 161: ...6 Illustrated Parts Breakdown Exploded View Field Replaceable Units ...
Page 168: ......
Page 169: ...A Specifications System Specifications ...
Page 179: ...C IRQ and I O Port Addresses Interrupt Requests PIRQ and PCI Device ...
Page 188: ......
Page 198: ......
Page 203: ...xx ...
Page 204: ... 456 01673 000 ...