![background image](http://html1.mh-extra.com/html/namco/pac-man-smash/pac-man-smash_operation-manuals_704740083.webp)
Test Mode
Troubleshooting
81
Assembly
8A. Installation and Assembly
- Must be performed by a technician -
Lead out and connect the two connectors through the holes, and secure them with the coating
clips.
z
Store the excess harness length below the holes so that there is no slack in the
connected connectors and harnesses above the holes.
Connector
Coating clip
Hole
Goal (L) assembly
Temporarily secure the goal (L) assembly with the two
fl
ange socket bolts (M5 x 16) removed in
step
and four
fl
ange socket bolt (M5 x 10).
Flange socket
bolt (M5 x 16)
(temporarily secured)
Flange socket bolt (M5 x 10)
(temporarily secured)
Goal (L) assembly
z
When installing, be sure to use bolts of the specifi ed length.
z
When installing, be careful not to pinch the connectors.
Follow the same procedure as steps
to
to temporarily secure the goal (R) assembly.
M259_08A_ENin6.indd 81
M259_08A_ENin6.indd 81
2/5/2013 8:09:30 AM
2/5/2013 8:09:30 AM