![background image](http://html1.mh-extra.com/html/namco/pac-man-smash/pac-man-smash_operation-manuals_704740108.webp)
8A. Installation and Assembly
106
- Must be performed by a technician -
8A-3 Connecting the Power Cord and Ground
z
Be sure to install the ground wire. Failure to install the ground wire may result in electric shock in
the event of electrical leakage.
Insert the socket side of the power cord into the power supply input socket of the cordbox
assembly.
Power cord socket
Cord box assembly
Insert the power cord plug into an outlet.
8A-4 Checks after Installation
After installation is complete, test each item in the Test mode, and set the necessary items in the Setting mode. (See
“7-8 Test Mode” on page 41 and “7-9 Setting Mode” on page 51.)
z
After installation is complete, be sure to perform the puck supply operation to add
pucks into the machine. (See “L Hopper Motor ON/OFF Test and Sensor Check”
on page 47 and “7-8-7 S Hopper Motor ON/OFF Test and Sensor Check” on page
48.)
z
After adding mini pucks into the machine, check that there are ten mini pucks in
each of the right and left sides of the mini puck stock area, and then be sure to reset
the mini puck decrease count. (See “7-9-9 Mini puck low warning ON/OFF” on page
60.)
M259_08A_ENin6.indd 106
M259_08A_ENin6.indd 106
2/5/2013 8:09:53 AM
2/5/2013 8:09:53 AM