2-14
PMP320HDW2v1
Preliminary
JUL 2010
PMP 320 Hardware Installation
Earth Ground cable assembly and connection
Procedure 2-2 Cabling and grounding the AP (Continued)
3
Run a 10 AWG ground strap from the ground lug on the AP to known good
ground (Protective Earth - PE).
AP Ground Lug
Ground the radio to the tower.
4
Be sure to reattach the bottom cover of the AP connection cover.
Summary of Contents for PMP 320
Page 8: ...Preliminary JUL 2010 iv PMP320HDW2v1 ...
Page 31: ......
Page 78: ...Preliminary JUL 2010 Chapter 4 Cables ...
Page 85: ......
Page 133: ...PMP320HDW2v1 7 31 JUL 2010 Preliminary Chapter 8 Regulatory Legal and Safety Notices ...