6-18
PMP320HDW2v1
Preliminary
JUL 2010
Connecting the power supply and the Ethernet cable to the computer Chapter 6: Connectorized CSM Hardware Installation
NOTE
If not using an existing approved grounding system, install a grounding system
(Protective Earth) according to applicable regulations or codes.
Ground the CSM using one of the following methods:
•
If grounding a CSM installed below the roof line, connect the CSM to the ground point of
the building and then attach all wires to the building using electrical staples. Use drip
loops as required.
•
If grounding an CSM that is installed above the roof line, then perform the following:
Connect the ground wire from the CSM/surge suppressor to the ground rod in the
ground next to the building.
Connect the ground rod to the household ground point according to the applicable
electrical code.
Attach all wires to the building using electrical staples. Use drip loops as required.
Use the following procedure to ground the CSM at the residence premises.
Procedure 6-11 Grounding the CSM
1
Wrap the AWG 10 (6mm2) copper ground wire around the ground post of
the CSM.
2
Remove the cover of the 600SSD surge suppressor.
3
Wrap the AWG 10 (6mm2) copper ground wire around the ground post of
the 600SSD.
4
Tighten the ground post locking nut.
5
Ensure the pin 4 selector in the 600SSD is set to the factory default of
isolated, not grounded.
6
If not using an existing approved grounding system, install a grounding
system (Protective Earth) according to applicable regulations or codes.
7
Connect the ground wire from the CSM and the 600SS to Earth Ground.
Connecting the power supply and the Ethernet cable to the
computer
Perform the following procedure to connect the power supply and the Ethernet cables.
Summary of Contents for PMP 320
Page 8: ...Preliminary JUL 2010 iv PMP320HDW2v1 ...
Page 31: ......
Page 78: ...Preliminary JUL 2010 Chapter 4 Cables ...
Page 85: ......
Page 133: ...PMP320HDW2v1 7 31 JUL 2010 Preliminary Chapter 8 Regulatory Legal and Safety Notices ...