PMP 320 Hardware Installation
Before you begin
Before you begin
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Ensure that you comply with standard local or national electrical and climbing procedures
when you install the CMM4.
WARNING
Installing a CMM involves electrical power and can involve height and exposure to
RF (Radio Frequency) energy. To avoid personal injury, know and follow applicable
national and local safety regulations and industry best practices, and follow the
specific guidelines in this document
If the CMM4 is being installed on a tower instead of a communications hut, the operator will
have to calculate the wind loading on the tower for the addition of the CMM4.
Avoiding Hazards
Use simple precautions to protect staff and equipment. Hazards include exposure to RF waves,
lightning strikes, and power surges. This section specifically recommends actions to abate
these hazards.
Grounding Equipment
Effective lightning protection diverts lightning current safely to ground, Protective Earth (PE).
It neither attracts nor prevents lightning strikes.
Summary of Contents for PMP 320
Page 8: ...Preliminary JUL 2010 iv PMP320HDW2v1 ...
Page 31: ......
Page 78: ...Preliminary JUL 2010 Chapter 4 Cables ...
Page 85: ......
Page 133: ...PMP320HDW2v1 7 31 JUL 2010 Preliminary Chapter 8 Regulatory Legal and Safety Notices ...