2-12
PMP320HDW2v1
Preliminary
JUL 2010
PMP 320 Hardware Installation
Earth Ground cable assembly and connection
Procedure 2-1 Assemble the AP and antenna for pole mounting (Continued)
Pole Is Shown
For Reference
Antenna
Radio
(Secured on Antenna)
VIEW A
DIV connector
MAIN connector
Earth Ground cable assembly and connection
Standard installation practices apply which include:
•
use of shielded Ethernet cable for all infrastructure cabling
•
use of drip loops at any point where the cable changes direction
•
extra cable (a splice loop) is provided for future use at any termination
•
ensuring the tower or structure is fully grounded (Protective Earth – PE)
•
use water tight tape, followed by electrical tape on all N-connectors
Procedure 2-2 Cabling and grounding the AP
Continued
Summary of Contents for PMP 320
Page 8: ...Preliminary JUL 2010 iv PMP320HDW2v1 ...
Page 31: ......
Page 78: ...Preliminary JUL 2010 Chapter 4 Cables ...
Page 85: ......
Page 133: ...PMP320HDW2v1 7 31 JUL 2010 Preliminary Chapter 8 Regulatory Legal and Safety Notices ...