The transfer switch automatically transfers power from the shore
power cord or generator through the transfer switch to the 110 Volt
AC breaker panel. When the generator is used as the power source
the transfer switch has a time delay built into it before transferring
power to the 110 Volt AC breaker panel. This allows the generator
time to warm up before an AC load is applied to it. The transfer
switch will automatically select the generator over shore power even
though shore power is hooked up.
NOTE: To prevent damage to the transfer switch do not
have appliances on or AC loads plugged into outlets when
hooking up to shore power or starting generator. The trans-
fer switch will begin to disengage between 85-90 Volts AC.
Operation at this voltage may damage transfer switch,
appliances or other items plugged into outlets.
The generator is located in the front compart-
ment of the motorhome. The generator can be started from the
following locations:
• The generator remote switch located on the monitor
panel.
• The generator remote switch in the drivers area.
• The generator control panel located on the generator.
• The control panel in the bedroom.
Prestart Checks:
Prior to the first start of the day perform a general inspection
including oil and coolant levels. Keep a maintenance log on
number of hours in operation since the last service. Before start-
ing the generator:
• Perform any service or maintenance that may be due.
• Make sure people and animals are clear of hazards of
electrical shock and moving parts.
• Have all appliances and other large AC electrical loads
are off.
Push and hold control switch in START position until the generator starts.
Release switch. On diesel models the control switch may flash up to 15
seconds, indicating engine preheat.
NOTE: Diesel models may require priming. Hold control switch in the
OFF position for one minute. Repeat if necessary. The diesel generator
fuel pick-up tube is cut to approximately 1/4 tank so as not to run the
main engine out of fuel.
Electrical Systems - House
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
S I G N A T U R E
8 • 1 9 2
Generator Control Panel:
1. Start/Stop Switch.
2.Hour Meter.
3.Output Breaker.
2
1
3
Starting the
Generator
Transfer Switch
GENERATOR - 120 AC
Summary of Contents for SIGNATURE 2001 series
Page 1: ......
Page 3: ...FOLD CUT ALONG DOTTED LINE FOLD...
Page 7: ......
Page 25: ......
Page 73: ...Driving Safety SIGNATURE SERIES 2 7 3 NOTES...
Page 75: ......
Page 99: ...Care Maintenance SIGNATURE 3 9 9 NOTES...
Page 101: ......
Page 127: ......
Page 157: ......
Page 177: ......
Page 187: ......
Page 223: ......
Page 259: ......