A953 HANDY GOT
Wiring and Handling of Switches 3
3-2
3.1
Outline of switches
The Handy GOT is equipped with the following switches and indicator LEDs.
1) Switch assignment
The figure below shows assignment of the switches. Each switch is abbreviated as shown in
the table below.
Switches requiring external wiring
The following switches are required to be connected to the PLC or an external input
equipment by way of a connector for operation switches.
-
Operation switches
-
Emergency stop switch
Switch and LEDs not requiring external switches
The following switch and LEDs are connected to the display unit CPU, and perform serial
communication with the PLC by way of the communication connector. Accordingly, wiring is
not required.
-
Grip switch
-
Operation indicator LEDs
Abbreviation
Name
Reference
SW1 to SW4
Operation switches
3.2
ES1
Emergency stop switch
L1 to L4
Indicator LEDs for operation switches
3.3
L5
Indicator LED grip stop switch
3.4
−
Grip switch
POWER
GRIP SW
SW1 SW2 SW3 SW4
ES1
L1
L2
L3
L4
L5
Grip switch
Summary of Contents for A953GOT-LBD-M3-H
Page 4: ...A953 HANDY GOT ii ...
Page 6: ...A953 HANDY GOT iv ...
Page 14: ...A953 HANDY GOT xii MEMO ...
Page 28: ...A953 HANDY GOT Introduction 1 1 8 MEMO ...
Page 42: ...A953 HANDY GOT Installation Wiring 2 2 14 MEMO ...
Page 58: ...A953 HANDY GOT Wiring and Handling of Switches 3 3 16 MEMO ...
Page 72: ...A953 HANDY GOT Specifications 4 4 14 MEMO ...
Page 80: ...A953 HANDY GOT CPU Direct Connection 6 6 6 MEMO ...
Page 98: ...A953 HANDY GOT Connection to PLC by Omron 8 8 10 MEMO ...
Page 104: ...A953 HANDY GOT Connection to PLC by Yaskawa Electric 9 9 6 MEMO ...
Page 108: ...A953 HANDY GOT Connection to PLC by Allen Bradley 10 10 4 MEMO ...
Page 130: ...A953 HANDY GOT Connection to PLC by Siemens 13 13 4 MEMO ...
Page 134: ...A953 HANDY GOT Diagnostics 14 14 4 MEMO ...
Page 141: ......