2-7
Installation
2Unpacking to Installation
2.2 Installation
2.2.1 Unpacking
Fig.2-1 : Unpacking the robot arm
The robot is shipped from the factory in cardboard and plywood frame packing. Always refer to
and
unpack the robot.
Handle the robot arm according to
"2.2.2Transportation procedures"
Always unpack the robot at a flat place. The robot could tilt over if unpacked at an
unstable place.
The unpacking process is shown below.
1) Using a knife, etc., slit the tape <1> fixing the upper lid <2> of the cardboard box. (
)
2) Pull the upper lid <2> of the cardboard box off with both hands. (
)
3) Remove the hexagon socket bolts <3> (four positions) which fix the robot. (
)
This completes the unpacking.
Note) The robot must be transported without removing the fixing plate A and B. Remove after installing.
When repackaging the robot in the wooden frame, always use the fixing plate.
②上ブタ
(a)
(b)
(c)
引き抜く
①テープ
固定台
③六角穴付ボルト
(4箇所)
ロボット本体
固定具A
固定具B
!
CAUTION
!
Always unpack the
robot at a flat place.
The robot could tilt
over if unpacked at an
unstable place.
<2>
Upper lid
Pull out
<1> Tape
Fixing
board
<3> Hexagon socket
bolts
(Four positions)
Robot arm
Fixing plate B
Fixing plate A
*The grease for preventing rust is applied at the tip of the shaft (J3 axis)
in general-purpose environment robot.
CAUTION
CAUTION