195
Selection of operation mode and
operation location
4
4.18 Selection of operation mode and operation location
4.18.1 Operation mode selection (Pr. 79)
The above parameters can be changed during a stop in any operation mode.
* The priorities of the frequency commands when
Pr. 79
= "3" are "Multi-speed operation (RL/RM/RH/REX) > PID control (X14) > terminal 4 analog
input (AU) > digital input from the operation panel".
Purpose
Parameter that must be set
Refer to page
Operation mode selection
Operation mode selection
Pr. 79
Started in network operation mode
Operation mode at power ON
Pr. 79, Pr. 340
Selection of operation location
Selection of start command source, speed
command source and operation location
during communication operation
Pr. 338, Pr. 339,
Pr. 550, Pr. 551
Used to select the operation mode of the inverter.
Mode can be changed as desired between operation using external command signals (external operation), operation
from the PU (FR-DU07/FR-PU04/FR-PU07), combined operation of PU operation and external operation (external/PU
combined operation, and network operation (when RS-485 terminals or a communication option is used).
Parameter
Number
Name
Initial
Value
Setting
Range
79
Operation mode selection
0
0 to 4, 6, 7
POINT
• Use the simple setting mode to set
Pr. 79
in simple steps.
Pr.79
Setting
Description
LED Indication
: OFF
: ON
Refer
to
0
Use external/PU switchover mode (press
to switch between the PU and External
operation mode.
At power ON, the inverter is in the External operation mode.
PU operation mode
External operation mode
NET operation mode
1
Operation mode
Frequency command
Start command
PU operation mode
PU operation mode (fixed)
Setting by the operation
panel (FR-DU07) and PU
(FR-PU04/FR-PU07)
Input by
and
on
PU (FR-DU07/FR-PU04/
FR-PU07)
2
External operation mode (fixed)
The operation can be
performed by switching
between the External and NET
operation modes.
External signal input (from
terminal 2, 4, and 1, JOG,
multi-speed selection, etc.)
External signal input (from
terminal STF and STR)
External operation mode
NET operation mode
3
External/PU combined
operation mode 1
PU (FR-DU07/FR-PU04/FR-
PU07) setting or external
signal input (multi-speed
setting, across terminals 4
and 5 (valid when AU signal
turns ON)). *
External signal input
(terminal STF, STR)
4
External/PU combined
operation mode 2
External signal input
(Terminal 2, 4, 1, JOG,
multi-speed selection, etc.)
Input by
and
on
PU (FR-DU07/FR-PU04/
FR-PU07)
6
Switchover mode
Switch among PU operation, External operating, and NET operation while keeping the
same operating status.
PU operation mode
External operation mode
NET operation mode
7
External operation mode (PU operation interlock)
X12 signal ON: Operation mode can be switched to the PU operation mode.
(output stop during external operation)
X12 signal OFF: Operation mode cannot be switched to the PU operation mode.
REMARKS
If switching of the operation mode is invalid even though
Pr. 79
is set,
refer to page 351
Summary of Contents for 700 Series
Page 11: ...MEMO ...
Page 23: ...12 MEMO ...
Page 341: ...330 MEMO ...
Page 365: ...354 MEMO ...
Page 379: ...368 MEMO ...
Page 397: ...386 MEMO ...
Page 414: ...403 MEMO ...