278
PID control
Pre-charge operation at output shutoff
When the pre-charge operation is valid, the pre-charge operation is performed at the output shutoff cancellation.
(The pre-charge operation is also performed even if the automatic restart after instantaneous power failure is valid.)
When the output is shutoff during PID control, which is performed after the pre-charge operation
When the output is shutoff during the pre-charge operation
REMARKS
If the output shutoff is canceled while the X77 signal is ON, the pre-charge operation is not performed and PID control is
performed.
Pr.127
0Hz
STF
MRS
Y47
Y49
Output signal
Pr.762
Pr.762
PID control
PID control
Pre-charge
Pre-charge
Output frequency[Hz]
Output
shutoff
X77
OFF
Pre-charges again.
Time
Pr.127
0Hz
STF
MRS
Y47
Y49
Output signal
Pr.762
Pr.762
PID control
Pre-charge
Pre-charge
Output frequency[Hz]
Pre-charge
Output shutoff
Time
Summary of Contents for 700 Series
Page 11: ...MEMO ...
Page 23: ...12 MEMO ...
Page 341: ...330 MEMO ...
Page 365: ...354 MEMO ...
Page 379: ...368 MEMO ...
Page 397: ...386 MEMO ...
Page 414: ...403 MEMO ...