91
Measurement limits for IT earthing system:
Low limit U12
7,9)
Min. voltage
[0 V … 499 V]
High limit U12
7,9)
Max. voltage
[0 V … 499 V]
Low limit U12
8)
Min. voltage
[-
20% … 20%]
High limit U12
8)
Max. voltage
[-
20% … 20%]
Low limit U1pe
7,8)
Min. voltage
[0 V … 499 V]
High limit U1pe
7,8)
Max. voltage
[0 V … 499 V]
Low limit U2pe
7,8)
Min. voltage
[0 V … 499 V]
High limit U2pe
7,8)
Max. voltage
[0 V … 499 V]
Low limit U13
9)
Min. voltage
[0 V … 499 V]
High limit U13
9)
Max. voltage
[0 V … 499 V]
Low limit U23
9)
Min. voltage
[0 V … 499 V]
High limit U23
9)
Max. voltage
[0 V … 499 V]
Low limit Ull
10)
Min. voltage
[-
20% … 20%]
High limit Ull
10)
Max. voltage
[-
20% … 20%]
7)
In case of 1-phase voltage system and limit type set to voltage.
8)
In case of 1-phase voltage system and limit type set to %.
9)
In case of 3-phase voltage system and limit type set to voltage.
10)
In case of 3-phase voltage system and limit type set to %.
Connection diagrams
Figure 7.2: Connection of 3-wire test lead and optional adapter in three-phase system
Figure 7.3: Connection of Plug commander and 3-wire test lead in single-phase system
Measurement procedure
Enter the
Voltage
function.
Connect test cable to the instrument.
Connect test leads to object under test (see
Start the continuous measurement.