MI 3152(H)
Eurotest
XC (2,5 kV)
Tests and measurements
100
Measurement procedure
Enter the
R low
function.
Set test parameters / limits.
Connect test cable to the instrument.
Compensate the test leads resistance if necessary, see section
Disconnect tested installation from mains supply and discharge insulation as required.
Start the measurement.
Save results (optional).
Figure 7.20: Examples of R low measurement result
Measurement results / sub-results
R
Resistance
R+
Result at positive test polarity
R-
Result at negative test polarity